Devere Building warehouse respray — Sunderland
The Devere Building, a 60,000 sq ft warehouse in Sunderland, resprayed in RAL 7021 black grey, with shutters, trims, windows and doors in RAL 9005 jet black. All areas were high-pressure washed first and the works were completed over three weeks on a live site.
- Project type
- 60,000 sq ft warehouse cladding, brickwork, shutter & trim respray
- Location
- Sunderland
- Duration
- 21 days · Live site

Project overview
The Devere Building in Sunderland, a 60,000 sq ft warehouse, was resprayed in RAL 7021 black grey across all cladding and exterior brickwork, with shutters, trims, windows and doors in RAL 9005 jet black. The building’s original finish was weathered yellow cladding over a brick base, shown in the supplied before photographs. The programme was completed over three weeks while the site remained live.
Original condition
Original weathered yellow cladding over a brick base, shown in the supplied before photographs.
Scope of work
- All cladding and exterior brickwork resprayed in RAL 7021 black grey
- All areas high-pressure washed first, removing grime, muck and old flaking coating
- All shutters and trims resprayed in RAL 9005 jet black
- All office windows and doors resprayed in RAL 9005 jet black
Surfaces & finishes
- All cladding and exterior brickwork — RAL 7021 black grey
- All shutters and trims — RAL 9005 jet black
- Office windows and doors — RAL 9005 jet black
Access & preparation
- All areas high-pressure washed first, removing grime, muck and old flaking coating
- Scissor lift and cherry picker access as shown in the supplied photographs
- Windows, doors and adjoining surfaces masked and protected
Application
All cladding and exterior brickwork were resprayed in RAL 7021 black grey. All shutters and trims were resprayed in RAL 9005 jet black, as were the windows and doors to the main office building.
Site considerations
The site remained live throughout the three-week programme, with works carried out from scissor lift and cherry picker access across the building’s elevations.
Completed result
All cladding and brickwork resprayed in RAL 7021 black grey with shutters, trims, windows and doors in RAL 9005 jet black, completed over three weeks on a live site. 10-year warranties on this project.
Project-specific warranty
10-year warranties on this project. This company-confirmed statement relates only to the work described in this case study, not every project. Ask us for the applicable written warranty scope and terms when discussing your property.
Before & after


Project photographs










Planning a similar project?
Tell us about your property and we’ll discuss the scope, preparation and coating approach.
Give your building
a new lease of life.
Tell us about your commercial refurbishment project. Let’s discuss what’s possible.
Call 07309 029490 · Email ultimatespraying@gmail.com · Barnsley based, working UK-wide