Case study · Warehouses & factories

Devere Building warehouse respray — Sunderland

The Devere Building, a 60,000 sq ft warehouse in Sunderland, resprayed in RAL 7021 black grey, with shutters, trims, windows and doors in RAL 9005 jet black. All areas were high-pressure washed first and the works were completed over three weeks on a live site.

Project type
60,000 sq ft warehouse cladding, brickwork, shutter & trim respray
Location
Sunderland
Duration
21 days · Live site
Service
Industrial & warehouse respraying
Completed Sunderland warehouse office block with a dark charcoal exterior, windows and main entrance signage
Completed project · Company-supplied photograph.

Project overview

The Devere Building in Sunderland, a 60,000 sq ft warehouse, was resprayed in RAL 7021 black grey across all cladding and exterior brickwork, with shutters, trims, windows and doors in RAL 9005 jet black. The building’s original finish was weathered yellow cladding over a brick base, shown in the supplied before photographs. The programme was completed over three weeks while the site remained live.

Original condition

Original weathered yellow cladding over a brick base, shown in the supplied before photographs.

Scope of work

  • All cladding and exterior brickwork resprayed in RAL 7021 black grey
  • All areas high-pressure washed first, removing grime, muck and old flaking coating
  • All shutters and trims resprayed in RAL 9005 jet black
  • All office windows and doors resprayed in RAL 9005 jet black

Surfaces & finishes

  • All cladding and exterior brickwork — RAL 7021 black grey
  • All shutters and trims — RAL 9005 jet black
  • Office windows and doors — RAL 9005 jet black

Access & preparation

  • All areas high-pressure washed first, removing grime, muck and old flaking coating
  • Scissor lift and cherry picker access as shown in the supplied photographs
  • Windows, doors and adjoining surfaces masked and protected

Application

All cladding and exterior brickwork were resprayed in RAL 7021 black grey. All shutters and trims were resprayed in RAL 9005 jet black, as were the windows and doors to the main office building.

Site considerations

The site remained live throughout the three-week programme, with works carried out from scissor lift and cherry picker access across the building’s elevations.

Completed result

All cladding and brickwork resprayed in RAL 7021 black grey with shutters, trims, windows and doors in RAL 9005 jet black, completed over three weeks on a live site. 10-year warranties on this project.

Project-specific warranty

10-year warranties on this project. This company-confirmed statement relates only to the work described in this case study, not every project. Ask us for the applicable written warranty scope and terms when discussing your property.

Before & after

Company-supplied photograph: Sunderland warehouse loading dock bays with weathered yellow cladding and faded red dock doors before respraying
Before
Company-supplied photograph: Sunderland warehouse loading dock bays after respraying with RAL 7021 black grey cladding and RAL 9005 jet black shutters
After

Project photographs

Company-supplied photograph: Sunderland warehouse side elevation with weathered yellow cladding over a brick base before respraying
Before · side elevation · Company-supplied photograph.
Company-supplied photograph: Sunderland warehouse loading dock bays with faded red doors and weathered yellow cladding before respraying
Before · loading dock bays · Company-supplied photograph.
Company-supplied photograph: Elevated view of the Sunderland warehouse in its original weathered yellow condition before respraying
Before · original condition · Company-supplied photograph.
Company-supplied photograph: Sunderland warehouse being high-pressure washed from a boom lift before respraying
Preparation · high-pressure washing · Company-supplied photograph.
Company-supplied photograph: Sunderland warehouse office frontage being cleaned from a cherry picker before respraying
Preparation · office frontage · Company-supplied photograph.
Company-supplied photograph: Completed Sunderland warehouse side elevation in RAL 7021 black grey with a skip in the yard
Completed · side elevation · Company-supplied photograph.
Company-supplied photograph: Completed Sunderland warehouse side elevation with RAL 7021 black grey cladding and brickwork
Completed · cladding and brickwork · Company-supplied photograph.
Company-supplied photograph: Completed Sunderland warehouse office block and adjoining warehouse in dark charcoal seen across the yard
Completed · office frontage · Company-supplied photograph.
Company-supplied photograph: Completed Sunderland warehouse main entrance and office block with a dark charcoal exterior
Completed · main entrance · Company-supplied photograph.
Company-supplied photograph: Completed Sunderland warehouse loading dock bays with RAL 7021 black grey cladding and RAL 9005 jet black shutters
Completed · loading dock bays · Company-supplied photograph.

Planning a similar project?

Tell us about your property and we’ll discuss the scope, preparation and coating approach.

Give your building
a new lease of life.

Tell us about your commercial refurbishment project. Let’s discuss what’s possible.